Gilgel Gibe II 420 MW

Name of Project:

Gilgel Gibe II 420 MW



Country:
Ethiopia

Client:
Ethiopian Electric Power Corporation (EEPCo)

​​​​​The Gilgel Gibe II Hydropower Project is the second of the three plants included in the Gibe – Omo cascade and it is located some 250 km south- west of Addis Ababa and 80 Km north-east of Jima.

The project foresees a 50 m high gravity dam, with a crest length of 140 m.
The gross head of 505 m is created by a water way that crosses the ridge between the Gilgel Gibe valley and the Omo valley by means of 26 km of power tunnel and 1.2 km of penstocks.
The 26 Km power tunnel (D = 6 m) is being excavated almost entirely using TBM technology.
No. 4 Pelton turbines in the outdoor power house provide 420 MW installed power producing 1650 GWh annually.

With Gibe II, the national power has increased by 80%, achieving the goal set by the government of bringing electric energy to one million new users and allowing 20% of the population to have access to electricity by 2010.​

MAIN TECHNICAL DATA:
Dam height: 50 m
Crest length: 140 m
Power tunnel: 26 km
Installed power: 420 MW
Energy output per year: 1,625 Gwh
FIND OUT MORE ON MAGAZINE
Blue Nile 602x343
SPECIAL ISSUES - 14/12/2016THE WATER TOWER OF AFRICA
REPORTAGE - 20/07/2016THE WALLS THAT HARNESS WATER
REPORTAGE - 01/10/2015ETHIOPIA, AFRICA'S DREAM

Last update: 29/05/2019

OTHER PROJECTS: Ethiopia