Angostura hydroelectric project

Name of Project:

Angostura hydroelectric project



Country:
Chile

Client:
Colbún S.A. - Santiago – Cile

Total value:
€240 million, share €156 million

Start of works:
June 2010

Expected duration:
38 months

The project is situated approximately 600 km south of Santiago, in the municipality of Santa Barbara y Quilaco in the region of the Bío-Bío River 63 km south-east of the city of Los Angeles; downstream of the confluence of the Bío-Bío River with the Huequecura River, in the gully known as Angoustura del Piulo where the main intake starts.

The main civil works include the construction of an earth dam approximately 1.6 km long and 25 metres high on the left bank of the river and the construction of a Rollcrete dam 125 m long and 63 m high with a spillway incorporated along the Bío-Bío River.

The purpose of the project is the generation of electricity through a plant with an installed capacity of 316 MW, supplied by the reservoir of water formed by the two rivers; 1,542 Gwh of energy will be produced annually.
 

MAIN TECHNICAL DATA:
Open excavations: 936,000 m3
Underground excavations: 328,000 m3
Embankments 1,393.00 m3
Concrete: 200,000 m3

OTHER PROJECTS: Chile

Last update: 18/09/2013