Development of Idu Industrial Area Engineering infrastructure (AREA 1B District of Abuja)

Name of Project:

Development of Idu Industrial Area Engineering infrastructure (AREA 1B District of Abuja)



Country:
Nigeria

Client:
Department of Engineering Services Federal Capital Development Authority (FCDA)

Total value:
€ 246 million

Start of works:
February 2002

Expected duration:
145 months

The IDU infrastructures are designed for the creation of a new industrial district on the outskirts of Abuja.
The project covers an area of 550 hectares and consists of the construction of all the primary urbanisation works – roads and viaducts, service and parking areas, sewage and drainage systems, water and electricity supply networks – necessary to service the small and medium-sized industries which will occupy the more than 200 lots into which the area is divided.

MAIN TECHNICAL DATA:
Road network (various categories):  20.72 Km
Bridges: 8
Length of manholes: 1.340 m
Length of underground drainage system: 46.060 m
Length of sewerage system: (PVC+R/C): 29.994 m
Length of aqueduct: 34.394 m

Electrical works:

Substations 33/11 KVA: 2
Transformers 11/0.415 KVA: 108
Length of electrical grid: 70.265 m
Street lights: 810 
Length of street lighting grid: 35.471 m
Wastewater treatment system: 1

 