Lugoj-Deva Motorway, Lot 2

Name of Project:

Lugoj-Deva Motorway, Lot 2



Country:
Romania

Client:
Romanian National Company of Motorways and National Roads

Total value:
€ 153 million

Start of works:
October 2013

Expected duration:
30 months

The project involves the construction of a section of motorway, from scratch, 28.6 km long, which connects Lugoj to Deva. The Lugoj-Deva motorway is part of the Pan-European Corridor IV, which starts in Germany and continues through Prague-Vienna-Bratislava-Budapest.

The main works for constructing this section of motorway also include the building of two bridges, twelve overpasses, two viaducts, numerous structures for water drainage, as well as small bridges, parking areas, service areas and acceleration and deceleration lanes.

MAIN TECHNICAL DATA:
Excavations: 5,500,000 m3
Earth moving: 4,600,000 m3
Asphalt: 400,000 tons
Bridges: 2
Overpasses: 12
Viaducts: 2