I-10 Corridor Express Lanes, California

Name of Project:
I-10 Corridor Express Lanes, California


Country:
USA

Total value:
$404 million

August 20, 2018: The Salini Impregilo Group, through its U.S. subsidiary, The Lane Construction Corporation, has won a design-build joint-venture contract with Security Paving Company, Inc. to construct the I-10 Corridor Contract 1 Express Lanes in California.

The work's overall value amounts to $672.9 million, with Lane’s share of the contract valued at $404 million.

The I-10 Corridor is a critical link within the Inland Empire, serving local, commuter and interstate travellers. It also serves as a major trucking route between Southern California and the rest of the United States. The Contract 1 portion of the project involves designing and constructing 11 miles of two express lanes in each direction of the I-10 from the Los Angeles/San Bernardino County line to east of the I-10/I-15 interchange.

Once completed, the lanes are expected to reduce traffic congestion, increase throughput, enhance trip reliability and provide long-term congestion management of the corridor in the Inland Empire.

Work is expected to begin by the end of 2018 and be completed in the first half of 2023

OTHER PROJECTS: USA