The Webuild Group's websites
Discover all our websites: a digital ecosystem that tells the story of the world we have built in over 117 years of history
Webuild Group Main Companies

Discover the websites of the Webuild Group Main Companies

Milan's M4 Metro

Discover the new Milan's Metro Line Project mini website

Terzo Valico Project

Discover the Terzo Valico dei Giovi Project mini website

Genoa's Bridge Project

Discover the Genova San Giorgio Bridge Project mini website

Cantieri trasparenti

Discover the mini website of live webcams from Webuild's Italian construction sites

Webuild Australia

Discover the website of Webuild in Australia

Webuild Romania

Discover the website of Webuild in Romania


The most searched pages





The Webuild Group's websites
Discover all our websites: a digital ecosystem that tells the story of the world we have built in over 117 years of history
Webuild Group Main Companies

Discover the websites of the Webuild Group Main Companies

Milan's M4 Metro

Discover the new Milan's Metro Line Project mini website

Terzo Valico Project

Discover the Terzo Valico dei Giovi Project mini website

Genoa's Bridge Project

Discover the Genova San Giorgio Bridge Project mini website

Cantieri trasparenti

Discover the mini website of live webcams from Webuild's Italian construction sites

Webuild Australia

Discover the website of Webuild in Australia

Webuild Romania

Discover the website of Webuild in Romania



Go back

Abu Hamour Hydraulic Project

DAMS, HYDROELECTRIC POWER PLANTS

#HYDRAULIC WORKS
#QATAR
Project's overview
Dams, hydroelectric power plants

Qatar

Completed

The project involves the construction of a main water collection tunnel 9.5 km long and with an excavation diameter of 4.5 metres, as well as the construction of 24 access shafts.

The tunnel is excavated using two Earth Pressure Balance (EPB) Tunnel Boring Machines (TBM).

The project is part of the country's effort to improve Doha's infrastructure. It is the main contract completed in recent years as Qatar looks to modernize its system that drains and collects rainwater and underground water.

The tunnel, by connecting to the existing system, will drain an area of approximately 170 m2. It links to a single pumping station with a 19 m3/sec capacity built to eliminate the dozens of pumping stations located in various city locations and to reduce maintenance and operating costs.

Moreover, Abu Hamour is Qatar's first major underground tunnel.

Accolades - ENR Global Best Project 2017

Client: ASHGHAL - Public Works Authority

Technical data

+ + +

m main tunnel

+ + +

m branches with microtunellin

+ + +

main wells

+ + +

secondary wells

+ + +

m3 underground tunnel excavation 

+ + +

prefabricated ashlars 

+ + +

m3 concrete 

+ + +

t iron for reinforcement 

Abu Hamour Hydraulic Project

Information material - Bridge project over the Strait of Messina
(*) Required information