The Webuild Group's websites
Discover all our websites: a digital ecosystem that tells the story of the world we have built in over 117 years of history
Webuild Group Main Companies

Discover the websites of the Webuild Group Main Companies

Milan's M4 Metro

Discover the new Milan's Metro Line Project mini website

Terzo Valico Project

Discover the Terzo Valico dei Giovi Project mini website

Genoa's Bridge Project

Discover the Genova San Giorgio Bridge Project mini website

Cantieri trasparenti

Discover the mini website of live webcams from Webuild's Italian construction sites

Webuild Australia

Discover the website of Webuild in Australia

Webuild Romania

Discover the website of Webuild in Romania


The most searched pages





The Webuild Group's websites
Discover all our websites: a digital ecosystem that tells the story of the world we have built in over 117 years of history
Webuild Group Main Companies

Discover the websites of the Webuild Group Main Companies

Milan's M4 Metro

Discover the new Milan's Metro Line Project mini website

Terzo Valico Project

Discover the Terzo Valico dei Giovi Project mini website

Genoa's Bridge Project

Discover the Genova San Giorgio Bridge Project mini website

Cantieri trasparenti

Discover the mini website of live webcams from Webuild's Italian construction sites

Webuild Australia

Discover the website of Webuild in Australia

Webuild Romania

Discover the website of Webuild in Romania



Go back

Deep Sewer Tunnel

DAMS, HYDROELECTRIC POWER PLANTS

#TUNNEL
# OPERE IDRAULICHE
#UNITED ARAB EMIRATES
Project's overview
Dams, hydroelectric power plants

United Arab Emirates

Completed

The project involved the construction of two out of three lots of the STEP Programme (Strategic Tunnel Enhancement Programme), featuring the construction of a tunnel approximately 40 km long which is designed to collect the wastewaters of the island and mainland of Abu Dhabi by means of gravity and direct them to the treatment plant located in Al Wathba.

The works consisted of the construction of 25 km of the tunnel with an excavation diameter of approximately 7 metres and 10 access shafts with depths varying between 40 and 80 metres.

The project, which is particularly complex from a technical and organisational point of view, involved the simultaneous use of five TBMs (Tunnel Boring Machines) at earth pressure, capable of excavating and at the same time coating the tunnel with prefabricated concrete.
It is the first time that this sophisticated, mechanised excavation technology has been used in Abu Dhabi.
Both the hydraulic tunnel and the access shafts are covered with a special membrane which will guarantee the concrete structures total protection from the aggressive ambient and will last at least one hundred years.

The upgrading of the sewer system to meet the demands of future generations was an ambitious project, allowing for the treatment of an average wastewater flow of 800,000 m3 per day. 

Client: Abu Dhabi Sewerage Services Company (ADSSC) Abu Dhabi Water & Electricity Authority (ADWEA)

Technical data

+ + +

m3 Excavation underground

+ + +

m3 Concrete

+ + +

 tons Steel reinforcement 

+ + +

prefabricated blocks 

+ + +

m2 HDPE membrane 

Abu Dhabi Grand Mosque

Abu Dhabi Grand Mosque

READ MORE
Dubai Ras al Khor Highway Interchange

Dubai Ras al Khor Highway Interchange

READ MORE
Al Maktoum international airport

Al Maktoum international airport

READ MORE

Insights

National Geographic reports on Abu Dhabi's STEP project.

Deep Sewer Tunnel