The Webuild Group's websites
Discover all our websites: a digital ecosystem that tells the story of the world we have built in over 117 years of history
Webuild Group Main Companies

Discover the websites of the Webuild Group Main Companies

Milan's M4 Metro

Discover the new Milan's Metro Line Project mini website

Terzo Valico Project

Discover the Terzo Valico dei Giovi Project mini website

Genoa's Bridge Project

Discover the Genova San Giorgio Bridge Project mini website

Cantieri trasparenti

Discover the mini website of live webcams from Webuild's Italian construction sites

Webuild Australia

Discover the website of Webuild in Australia

Webuild Romania

Discover the website of Webuild in Romania


The most searched pages





The Webuild Group's websites
Discover all our websites: a digital ecosystem that tells the story of the world we have built in over 117 years of history
Webuild Group Main Companies

Discover the websites of the Webuild Group Main Companies

Milan's M4 Metro

Discover the new Milan's Metro Line Project mini website

Terzo Valico Project

Discover the Terzo Valico dei Giovi Project mini website

Genoa's Bridge Project

Discover the Genova San Giorgio Bridge Project mini website

Cantieri trasparenti

Discover the mini website of live webcams from Webuild's Italian construction sites

Webuild Australia

Discover the website of Webuild in Australia

Webuild Romania

Discover the website of Webuild in Romania



Go back

Ulu Jelai Hydroelectric Project

DAMS, HYDROELECTRIC POWER PLANTS

#HYDROELECTRIC PLANTS
# DAMS
#MALAYSIA
Project's overview
Dams, hydroelectric power plants

Malaysia

Completed

The project is located approximately 200 Km north of Kuala Lumpur, in the state of Pahang.

The main component was the construction of the Susu dam on the Bertram River, more than 80 metres high and constructed entirely using RCC (roller compacted concrete) technology, with a total volume of about 750,000 m3. In addition to the dam, the project involved the construction of an underground plant, equipped with two Francis turbines with a power output of 191 MW each and the construction of approximately 26 Km of hydraulic tunnels, of which approximately 15 Km excavated with Tunnel Boring Machines (TBM) and the remaining with the traditional method. The installed power of the system is 382 MW.

KPI

Technical data

+ + +

m height

+ + +

m in length

+ + +

m3 of excavation and earthmoving

+ + +

m3 of underground rock excavation

+ + +

m3 volume concrete works

+ + +

m3 dam volume in RCC

+ + +

m3 dam volume in RCC

Insights

Ulu Jelai: Green Energy for Malaysia

Ulu Jelai Hydroelectric Project

Information material - Bridge project over the Strait of Messina
(*) Required information