The Webuild Group's websites
Discover all our websites: a digital ecosystem that tells the story of the world we have built in over 117 years of history
Webuild Group Main Companies

Discover the websites of the Webuild Group Main Companies

Milan's M4 Metro

Discover the new Milan's Metro Line Project mini website

Terzo Valico Project

Discover the Terzo Valico dei Giovi Project mini website

Genoa's Bridge Project

Discover the Genova San Giorgio Bridge Project mini website

Cantieri trasparenti

Discover the mini website of live webcams from Webuild's Italian construction sites

Webuild Australia

Discover the website of Webuild in Australia

Webuild Romania

Discover the website of Webuild in Romania


The most searched pages





The Webuild Group's websites
Discover all our websites: a digital ecosystem that tells the story of the world we have built in over 117 years of history
Webuild Group Main Companies

Discover the websites of the Webuild Group Main Companies

Milan's M4 Metro

Discover the new Milan's Metro Line Project mini website

Terzo Valico Project

Discover the Terzo Valico dei Giovi Project mini website

Genoa's Bridge Project

Discover the Genova San Giorgio Bridge Project mini website

Cantieri trasparenti

Discover the mini website of live webcams from Webuild's Italian construction sites

Webuild Australia

Discover the website of Webuild in Australia

Webuild Romania

Discover the website of Webuild in Romania



Go back

Turin-Lyon Tunnel, Lot 5A

RAILWAYS AND SUBWAYS

Project's overview
Tunnels

France

In progress
Torino Lione Lotto5

The Lot 5A contract, commissioned by Tunnel Euralpin Lyon Turin (TELT), is located at the center of the planned 57.5-kilometre base tunnel between the train stations of Susa in Italy and Saint-Jean-de-Maurienne in France, and it consists of preparatory works for the future safety site at Modane. The excavations will create a logistics hub 500 metres below ground ahead of the drilling of 18 kilometres of tunnel under the Ambin Massif in the direction of Italy.

The Group will develop the project with joint-venture partners Vinci Construction Grands Projets, Dodin Campenon Bernard, VINCI Construction France and Bergteamet. Webuild has a 33% stake.

By 2030, the Turin-Lyon link will take enough trucks off the roads to contribute to the reduction of the equivalent of three million tonnes of CO2 each year.​​

Turin-Lyon Tunnel, Lot 5A

Information material - Bridge project over the Strait of Messina
(*) Required information